The county enacted a Stormwater Management Law in 2011 requiring the county to assess current conditions and identify cost-effective projects to directly address flooding and flood damage and impacts in Westchester communities. County projects to lessen the risks and impacts associated with flooding will also be guided by these plans. A Stormwater Advisory Board created under the law began meeting in 2012 and is advising the county on flood-related matters, including the development of the reconnaissance plans and flood mitigation projects funded under the law.
County Stormwater Management Law formalized a partnership program whereby Westchester County may provide funding assistance to partnering municipalities for flood mitigation or flood damage reduction projects. Projects must be included in stormwater reconnaissance plans approved by the Board of Legislators. The reconnaissance plans are prepared by the County departments of Planning and Public Works and Transportation for each major drainage basin. The flood mitigation program provides up to 50% matching funds for eligible projects. Projects must not create or exacerbate flooding elsewhere and should have a demonstrated flood mitigation benefit. Note that the funding application process is lengthy and typically takes six months or more. Working with the municipalities in each of these watersheds as well as the county's Department of Public Works and Transportation, Planning has completed all five reconnaissance plans, and they have been approved by the Westchester County Board of Legislators:
(1) Stormwater Reconnaissance Plan for the Saw Mill River-Pocantico River Watershed (December 2012)
(2) Stormwater Reconnaissance Plan for the Bronx River Watershed (April 2013)
(3) Stormwater Reconnaissance Plan for the Coastal Long Island Sound Watershed (August 2013)
(4) Stormwater Reconnaissance Plan for the Peekskill-Haverstraw Bay Watershed (March 2014)
(5) Stormwater Reconnaissance Plan for the Croton River and Inland Long Island Sound Watersheds (July 2014)
Funding can be utilized for the preparation of engineering and design for a flood mitigation project to include the preparation of detailed construction plans and specifications necessary for bidding purposes. Program resources can also be used for construction of the project. An operation and maintenance plan will be prepared during the development of detailed construction plans. All operation and maintenance activities will be a condition of the IMA and all associated O&M costs will be the responsibility of the municipality.